Templates035 Completes 500MW Solar-Plus-Storage Project in Middle East

Templates035 Completes 500MW Solar-Plus-Storage Project in Middle East
Templates035 announces the successful completion and grid connection of a landmark 500MW solar photovoltaic plant paired with a 250MWh battery energy storage system in the United Arab Emirates, representing one of the largest solar-plus-storage installations in the MENA region.
Project Specifications
- 500MW DC / 400MW AC solar PV using 714,000 TOPCon bifacial modules on single-axis trackers
- 250MWh / 125MW LFP battery energy storage system in 50× containerized BESS units
- Annual energy production: 1,050 GWh (enough to power 120,000 households)
- Levelized Cost of Energy (LCOE): $0.0179/kWh — record-low for the region
Technical Achievements
- Bifacial energy gain of 18% from high-albedo desert sand surface
- BESS providing 4 hours of evening peak shifting, extending solar generation to 10 PM
- Grid-forming PCS enabling synthetic inertia and frequency regulation services
- Remote O&M via satellite-connected SCADA with drone-based thermal inspection
"This project demonstrates that solar-plus-storage can deliver firm, dispatchable renewable energy at costs below conventional fossil fuel generation. Templates035 is proud to support the UAE's Net Zero 2050 strategic initiative." - VP Projects, Templates035
Related News
Our Address
- No.93 Xinya Road, Luoshe Town, Huishan District, Wuxi City, China
- +86 18762610207
- business@hcmachining.cn
© 2026 Wuxi Haicheng Machinery Manufacturing Co., Ltd. - All rights reserved 苏ICP备2026016696号-1